·2,447,543篇论文数据,部分数据来源于NoteExpress
Such methods include that filling earth in the traffic bridge to change the position of gravitative centre of sluice chamber, and adding insertwalls to reduce the wall pressure of boxshaped wall.
在城西闸闸室稳定设计中,利用公路桥桥面适当填土来调整闸室的重心位置,并增做刺墙以减小空箱岸墙的墙后受荷宽度。
youdao
应用推荐
模块上移
模块下移
不移动